|
Risk management in construction projects, a case study
Delivery method: File download link
Price: 300,000 Tomans ($2.7)
|
|
|
|
Project Subject: Siah Bisheh Pumped Storage Hydropower Plant (1000 MW)
This product includes 2 files in word format (editable) on the risk management review of the project.
File No. 1:
Pages: 23 / Format: word
Includes:
- Project Overview
- Risk Source Breakdown Structure
- Risk Breakdown Structure
- Identifying Project Risks with the Approach of Defining Risk Source, Primary Risk, Secondary Risk, and Risk Impact
- Drawing Risk Map or Risk Path
- Some Terms Used in Work Breakdown Structure
- Drawing Risk Breakdown Structure Matrix - Work Breakdown Structure
File No. 2:
Pages: 10 / Format: word
Includes:
- Risk Response Strategies
- Risk Register
- Pre-Mitigation Table
- Pre-Mitigation Matrix
- Risk Response
- Post-Mitigation Table
- Matrix post-Mitigation




As much as possible, we tried to display images of the important parts of both files.
Note: There are 2 other useful projects in this store for risk management that you can also use.
Project Risk Management / Powerpoint
English Risk Management Article with Translation
محصولات هم دستهProducts of the same category
product: Risk management in construction projects, a case study
|
price: 300,000 Tomans ($2.7)
|
|
|
Seller phone: 02144717937 - 09389233776
|
|
|
|